Search Our Site
安胜在中国永康的主要生产设施
这些设施规模庞大,在安胜的整体运营中发挥着至关重要的作用。
规模及产能:
- Total area: 420,000+ sqm (1.3 million+ sqft upon 2025 expansion).
- Monthly output: 9 million+ units, encompassing vacuum containers, specialty products.
主要业务部门 (BU):
- Vacuum Container BU: Hydro - forming technology for 2.4 million inner / outer cups monthly.
- Specialty Container BU: Deep - drawing + hydro - forming hybrid processes for 1.8 million premium products monthly.
- Commercial Container BU: Manufactures large SUS containers, household products, outdoor SUS ware, and irregular SUS items for 1.4m PCs.
- Ansheng Plastics: Holds the largest plastic parts capacity in the drinkware industry with over 230 injection machines, producing 4 million plastic parts monthly.
研究与开发:
销售收入的 10% 再投资于研发和自动化
- ODM DEVELOPMENT
- CMF TREATMENT
- INFORMATION SYSTEM
- AUTOMATION
- TEST CENTER
工厂人物
1268
建筑面积(1K平方尺)
3600
雇员
60+
百万
年产能
生产线
安胜首个海外制造基地落户马来西亚吉隆坡
它的范围相当广泛,在安胜的整体运营中发挥着至关重要的作用。
战略优势:
- Southeast Asia hub serving global markets. Proximity to Kuala Lumpur International Airport (14 miles) and Port Klang (30 miles), reducing logistics time by 30%.
三相容量扩展:
- Phase 1 (Q3 2024): 1.25 million units/year.
- Phase 2 (Q4 2025): 35 million units per year.
- Phase 3 (2026): Plastic Injection factory - localization.
本地化和质量:
- 90% raw materials locally sourced within 1 year (excluding molds).
- ISO 9001/14001/45001 certifications, supported by in - house lab testing (material strength, leak - proof performance).
工厂人物
1
百万
建筑面积(平方英尺)
800
雇员
2
百万
每月产能
安胜科技五年战略规划
升级
- · Hardware, Software & Talents
- · both China and Overseas
- · Digitalization
2025年
2026年
斜坡上升
- · Capacity increasing
- · Production Efficiency
- · Plastic tooling in-house
- · SEA sales center
可持续发展
- · Absolute emission reduction 7%
- · Carbon Foot-Prints
- · Sustainable material application
- · Overseas CMF treatment center
2027年
2028年
海外扩张三
- · Ansheng Malaysia Production Capacity Line 8th-9th
- · R&D + Tooling Center
- · Possible exploring overseas facility outside of Asia
差异化
- · Products
- · Digitalization+ Services
- · Manufacturing Capability
2029年
2025年
升级
- · Hardware, Software & Talents
- · both China and Overseas
- · Digitalization
2026年
斜坡上升
- · Capacity increasing
- · Production Efficiency
- · Plastic tooling in-house
- · SEA sales center
2027年
可持续发展
- · Absolute emission reduction 7%
- · Carbon Foot-Prints
- · Sustainable material application
- · Overseas CMF treatment center
2028年
海外扩张三
- · Ansheng Malaysia Production Capacity Line 8th-9th
- · R&D + Tooling Center
- · Possible exploring overseas facility outside of Asia
2029年
差异化
- · Products
- · Digitalization+ Services
- · Manufacturing Capability

